Login       My Wishlist
  My Cart
$0.00 / 0 items
 
The Dead Bell
The Best Names in Tools
International Access
Global Shipping Options Available
  Our Catalog   Electrical   Breakers, Load Centers & Fuses   Fuses

Blue Ox BX88272 ATM Fuse Bypass Switch with Long Lead


Huge Savings Item! Save 15% on the Blue Ox BX88272 ATM Fuse Bypass Switch with Long Lead by Blue Ox at The Dead Bell. MPN: BX88272. Hurry! Limited time offer. Offer valid only while supplies last. Stop pulling fuses every time you tow. Now you can disconnect your fuse with the flip of a switch. This switch provides a safe alternative to the constant removal and reinstallation of the fuse when changing from the towed mode to the driving mode.Easy to install. Simply flip a switch and tow. 2 levels of insulation. Safe design requires the fuse bypass switch to be as close to the fuse panel as possible. Heavy Duty Wiring.


Product Description & Reviews

Stop pulling fuses every time you tow. Now you can disconnect your fuse with the flip of a switch. This switch provides a safe alternative to the constant removal and reinstallation of the fuse when changing from the towed mode to the driving mode.Easy to install. Simply flip a switch and tow. 2 levels of insulation. Safe design requires the fuse bypass switch to be as close to the fuse panel as possible. Heavy Duty Wiring.

Features & Highlights

  • Easy to install
  • Simply flip a switch and tow
  • 2 levels of insulation
  • Safe design requires the fuse bypass switch to be as close to the fuse panel as possible
  • Heavy Duty Wiring

Additional Information

Manufacturer:Blue Ox
Brand:Blue Ox
Model:BX88272
Part Number:BX88272
Publisher:Blue Ox
Studio:Blue Ox
MPN:BX88272
UPC:798459086095
EAN:0798459086095
Item Weight:0.2 pounds
Item Size:7 x 13 x 13 inches
Package Weight:0.2 pounds
Package Size:11.7 x 3.5 x 3.5 inches

Blue Ox BX88272 ATM Fuse Bypass Switch with Long Lead by Blue Ox

Buy Now:
Blue Ox BX88272 ATM Fuse Bypass Switch with Long Lead

4.8 out of 5 stars with 10 reviews
Condition: New
Lead Time: 1 - 2 Business Days
Availability: In Stock
$65.00
$55.81
You Save: 14%


Quantity:  

 


View More In Fuses.

 


Have questions about this item, or would like to inquire about a custom or bulk order?


If you have any questions about this product, contact us by completing and submitting the form below. If you are looking for a specif part number, please include it with your message.

First Name:
Last Name:
Email Address:
Your Message:

Related Best Sellers


Bussmann LPJ-40SP, 40A 600V Cartridge Fuse
By Bussmann
mpn: LPJ-40SP, ean: 0616469727688,

Littelfuse KLKR030.T Class CC Fuse, Fast Acting, 600V, 30 Amp (Pack of 10)
By Littelfuse
mpn: KLKR030.T, ean: 0079458260731,

KLKD001 LITTELFUSE 1 AMP KLKD 600V FUSE FAST ACTING KLKD1 1A (BOX OF 10)
By Littelfuse
mpn: KLKD001,

Buss/Ferraz ANN/CNN 225A (225 Amp, ANN-225A, CNN-225A) Fuse Limiter 125 VAC
By Witonics
mpn: ANN/CNN 225A, ean: 0631908884753,

Bussmann FNQ-R-3 CC-Tron FNQR3 Fuse Cooper (Pack of 10)
By Bussmann
mpn: FNQ-R-3,

Bussmann KTK-30 Limitron KTK30 Fuse Cooper (Pack of 10)
By Bussmann
mpn: KTK-30,

Bussmann BP/FRN-R-25 25 Amp Fusetron Dual Element Time-Delay Current Limiting Fuse Class RK5, 250V UL Listed, 2-Pack
By Bussmann
mpn: BP/FRN-R-25, ean: 0051712112031,

Bussmann T-30 30 Amp Type T Time-Delay Dual-Element Edison Base Plug Fuse, 125V UL Listed
By Bussmann
sku: 5612593, mpn: T-30, ean: 0051712101240,

Mersen ATMR20 600V 20A Cc Fuse, 10-Pack
By Mersen
mpn: ATMR20,

Cooper Bussmann FRS-R-150 FuseTRON Class RK5 Dual Element Fuse
By Cooper Bussmann
sku: 242557N, mpn: FRS-R-150, ean: 0616469712356,



Privacy Policy / Terms of Service / Accessibility Statement
© 2020 - thedeadbell.com. All Rights Reserved.